Projects Completed

Sr. No.

Name of Projects

Total Cost (Rs.Million)

1

Rehabilitation of Supreme Court of Pakistan Registry Branch at Lahore

20.0

2

Master Planning & Design of UET Campus at KSK

366.0

3

Master Planning & Design of UET Campus at Faisalabad

293.43

4

Design of New Boys Hostel for 300 students

72.26

5

Design of Convocation Complex UET Lahore Campus

168.86

6

Design and supervision of construction of Mechanical Engineering
Department UET Faisalabad

54.57

7

Design of Manufacturing Technology Development Center UET Lahore Campus

17.14

8

Design and construction supervision of Metallurgical Engineering
Department UET Lahore

7.71

9

Design of Hostel for 180 Girls Students, UET Lahore

24.86

10

Design of Remodeling plan of Seminar Hall, Engineering University
Lahore

3.34

11

Design of Department of Arch. Engg. Engineering University Lahore

19.14

12

Design of Master Plan of Mayo Hospital, Lahore

42.86

13

Punjab Medical College and Hospital, Faisalabad

177.14

14

Master plan of King Edwards Medical College, Lahore

14.29

 

Projects In Hands
 

Sr. No.

Name of the Project

Cost of Project Rs.(Million)

1

Capacity Building of TEVTA for enhancement of quality in 12 Specialized Market
Driven Traders/Technologies- Ceramics and Glass Technologies (Microwave safe,
Oven safe, Freeze safe).

2.6

2

Capacity Building of TEVTA for enhancement of quality in 12 Specialized
Market Driven Traders/Technologies- CNG/LPG-Kits and Equipments (Manufacturing,
Installation and Maintenance).

2.6

3

Capacity Building of TEVTA for enhancement of quality in 12 Specialized Market
Driven Traders/Technologies- Energy (Generation and Maintenance).

2.6

4

Capacity Building of TEVTA for enhancement of quality in 12 Specialized Market
Driven Traders/Technologies- Heat Treatment Processing of Glass for Automation.

2.6

5

Third party validation-Quantitative and Qualitative analysis of D.C Colony, Gujranwala.

2.5

6

Structural assessment of fire damaged New Auriga Complex, Gulberg-II, Lahore.

1.0

7

Consultancy services for the detail designing of overhead Pedestrian Bridge over
Railway track- University of Education, Lahore.

0.12

8

Inspection of swings and rides in amusement Parks of Lahore City.

0.1

9

Consultancy Services for Construction of Projects UET Campus Kala Shah Kaho and
Rachna Gujranwala.

30.0

10

Hydrology Study of Diamamouve Dam Maritius- Engineering General Consultants,
Lahore.

0.35

11

Short Courses for Capacity Buildings of Technicians.

25.0

 

Projects Undertaken

01
02
03
04
05
06
07
08
09
10
11
12
13
14
01

 

1. Name of the Assignment

Rehabilitation of Supreme Court of Pakistan Registry Branch Lahore

2. Country

Pakistan

3. Name of Client

Planning and Development

4. Address

Lahore

5. Start Date

2010

6. Completion Date

2011

7. Professional staff provided

Architect structural engineer and Building Engineer, Electrical Engineer, Civil Engineer

8. No. of Staff

5

9. No. of Staff Months

8 months

10. Approx: Value of Services

Rs.700,000/-

11. Name of Other JV Firms

None

12. No. Of Staff / Staff Monts

None

13. Name / Position of Key Staff

Prof. Ziaud Din Mian, Vice President Engineering Dr. Burhan Shreef, Civil Engineer,

14. Description of Project

The project comprised of Evaluation of Rates of Bid Regarding the Civil Works, Plumbing Works, HVAC Works, Electrical Works,

 

02

1. Name of the Assignment

Master Planning and design of UET Campus at Kala Shah Kakoo

2. Country

Pakistan

3. Name of Client

Project Director UET Campus Kala Shah Kakoo Lahore

4. Address

UET Campus Kala Shah Kakoo Lahore

5. Start Date

January 2006

6. Completion Date

July 2008

7. Professional staff provided

Architect structural engineer and Building Engineer, Electric and Public Health

8. No. of Staff

10

9. No. of Staff Months

31 months

10. Approx: Value of Services

12.81M

11. Name of Other JV Firms

None

12. No. Of Staff / Staff Monts

None

13. Name / Position of Key Staff

Archt Muhammad Naeem Mir /
Ziaud Din Mian Structural Engineer
Dr. Burhan Shreef(Civil Engineer)
Hafiz Tahzeb ul Hassan Electrical Engineer
Dr. Jvaid Anwar Aziz Public Health Engr

14. Description of Project

The approved PC I of the project included the following buildings and services provision. Academic buildings namely Mechanical, Chemical, Electrical Engineering Departments, Basic Sciences and Humanities Department, Technology Incubation Centre and Continuing Engineering Education and Training Centre. Covered area 3,32,871 Sq Ft and estimated cost 417.74 M Pk Rs. Hostel for 300 students covered area 62,600 Sq Ft and estimated cost 75.12 M Pk Rs. Extension of Central Library and Admin Block covered area 1,03991 Sq Ft and estimated cost 125 M Pk Rs. Residential Buildings covered area 95,650 Sq Ft estimated cost 115 M Pk Rs. Site Development water Supply lines estimated cost 10 M Pk Rs. Water tank and tube well 20 M Pk Rs. Roads and paths 42 M Pk Rs. Electricity Distribution system 25.5 M Pk Rs. Sewer Lines and Disposal works 23.5 M. Pk Rs. Total Cost 853.86 M Pk Rs. Total land area Acres.

15. Description of Services

Preparation of P.C -I Architectural Structural Design and top Supervision Preparation of documents and contract management

03

1. Name of the Assignment

Master Planning and design of UET Campus at Faisalabad

2. Country

Pakistan

3. Name of Client

Project Director UET Campus Faisalabad Lahore

4. Address

UET Campus Faisalabad Lahore

5. Start Date

March 2006

6. Completion Date

March 2008

7. Professional staff provided

Architect structural engineer and Building Engineer, Electric and Public Health

8. No. of Staff

8

9. No. of Staff Months

24 months

10. Approx: Value of Services

10.27M

11. Name of Other JV Firms

None

12. No. Of Staff / Staff Monts

None

13. Name / Position of Key Staff

Archt Muhammad Naeem Mir /
Ziaud Din Mian Structural Engineer
Dr. Burhan Shreef(Civil Engineer)
Hafiz Tahzeb ul Hassan Electrical Engineer
Dr. Jvaid Anwar Aziz Public Health Engr

14. Description of Project

The approved PC I of the project included the following buildings and services provision. Academic buildings namely Mechanical & Mechatronics, Chemical & Polymer, Electrical & Electronics Engineering Departments, Basic Sciences and Humanities Department, Centre for Advanced Textile Technology, Technology Incubation Centre and Continuing Engineering Education and Training Centre. Covered area 3,23,545 Sq Ft and estimated cost 394.254 M Pk Rs. Hostel for 150 students covered area 33278 Sq Ft and estimated cost 75.12 M Pk Rs. Extension of Central Library and Admin Block covered area 56327 Sq Ft and estimated cost 65.07 M Pk Rs. Residential Buildings covered area 46110 Sq Ft estimated cost 55.332 M Pk Rs. Site Development water Supply lines estimated cost 15 M Pk Rs. Water tank and tube well 20 M Pk Rs. Roads and paths 20 M Pk Rs. Electricity Distribution system 20 M Pk Rs. Sewer Lines and Disposal works 20 M. Pk Rs. Total Cost 684.776 M Pk Rs Total land area 239 Acres.

15. Description of Services

Preparation of P.C -I Architectural Structural Design and top Supervision Preparation of documents and contract management

04

1. Name of the Assignment

New Boys Hostel

2. Country

Pakistan

3. Name of Client

P.D UET Lahore

4. Address

Lahore

5. Start Date

Sep 2008

6. Completion Date

Dec 2008

7. Professional staff provided

Architect structural engineer and Building Engineer

8. No. of Staff

8

9. No. of Staff Months

3 months

10. Approx: Value of Services

2.529 M

11. Name of Other JV Firms

None

12. No. Of Staff / Staff Monts

None

13. Name / Position of Key Staff

Archt Muhammad Naeem Mir /
Ziaud Din Mian Structural Engineer

14. Description of Project

The building consists of 39 dormitories and 66 cubicles, with support spaces, attached washrooms, dining Hall, TV lounges and study lounge. Exterior finishing is C.S Plaster with white weather shield paint, aluminum windows and reflective glass. The significant aspect of Architectural design is that all the room are on north south orientation that is ideal for reducing room temperature, that remain moderate and low on energy consumption. Description of actual services provided by your staff within the assignment: Complete services including Architectural design, Structural engineering design interior design and external finishes acoustic design, HVAC, Illumination design electrical engineering design. Public health engineering design. Preparation of BOQ’s estimation tender documents, bid evaluation for construction and resident supervision

05

1. Name of the Assignment

Convocation Complex

2. Country

Pakistan

3. Name of Client

P.D UET Lahore

4. Address

Lahore

5. Start Date

Sep 2006

6. Completion Date

March 2007

7. Professional staff provided

Architect structural engineer and Building Engineer

8. No. of Staff

6

9. No. of Staff Months

6 months

10. Approx: Value of Services

6.54 M

11. Name of Other JV Firms

None

12. No. Of Staff / Staff Monts

None

13. Name / Position of Key Staff

Dr. Mahmood Hussain,
Archt Muhammad Naeem Mir /
Ziaud Din Mian Structural Engineer

14. Description of Project

The purpose of this building is to hold convocation the most prestigious event in an academic institution. It consist of a main auditorium having a gallery with total capacity 2260 seats, along with 4 robbing rooms, 16 lecture rooms, 16 offices and 10 washroom at two levels ground and mezzanine. All the services and controls such as electricity /HVAC are accommodated in the basement over an area 14,000 SqFt. Total area of building is 140,000 SqFt.
The Plan configuration is a square shape and quarter circles on its sides. The 120’ wide Geodesic Dome uses aluminum sections for structure and composite opaque heat and acoustic insulation panels as skin. That was imported from USA (TEMCOR)

06

1. Name of the Assignment

Department of Mechanical Engineering UET Faisalabad Campus

2. Country

Pakistan

3. Name of Client

Project Director UET Lahore

4. Address

UET Lahore

5. Start Date

March 2007

6. Completion Date

July 2007

7. Professional staff provided

Architect structural engineer and Building Engineer

8. No. of Staff

6

9. No. of Staff Months

4 months

10. Approx: Value of Services

1.91 M

11. Name of Other JV Firms

None

12. No. Of Staff / Staff Monts

None

13. Name / Position of Key Staff

Archt Muhammad Naeem Mir /
Ziaud Din Mian Structural Engineer

14. Description of Project

The Building Houses Thermodynamic lab, Machine Tools lab computer lab Chairman room Administrative rooms store and 15 faculty rooms student capacity 150

15. Description of Services

Architectural Structural Design and top Supervision

07

1. Name of the Assignment

Manufacturing Technologies Development Centre UET Lahore

2. Country

Pakistan

3. Name of Client

Project Director UET Lahore

4. Address

UET Lahore

5. Start Date

July 2006

6. Completion Date

December 2006

7. Professional staff provided

Architect structural engineer and Building Engineer

8. No. of Staff

8

9. No. of Staff Months

5 months

10. Approx: Value of Services

0.60 M

11. Name of Other JV Firms

None

12. No. Of Staff / Staff Monts

None

13. Name / Position of Key Staff

Archt Muhammad Naeem Mir /
Ziaud Din Mian Structural Engineer

14. Description of Project

Purpose of the building was to house technical training institution for development of mechanical technologies. The building programme included space for various labs like Precision Machining, Non Conventional process, Measurement & Calibration, Rapid Prototyping & PCB, Maintenance Plant Engineering and Machine Tools & Production Tooling. Supporting facilities included lecture, demonstration and faculty rooms. It is a two story structure covering a total area of 40,350 SqFt.

15. Description of Services

Architectural Structural, Electrical & Public Health Engg Design and top Supervision

08

1. Name of the Assignment

Extension of Metallurgical Engineering Department UET Lahore.

2. Country

Pakistan

3. Name of Client

Project Director UET Lahore

4. Address

UET Lahore

5. Start Date

June 2005

6. Completion Date

August 2005

7. Professional staff provided

Architect structural engineer and Building Engineer

 

8. No. of Staff

2

9. No. of Staff Months

2 months

10. Approx: Value of Services

0.27 M

11. Name of Other JV Firms

None

12. No. Of Staff / Staff Monts

None

13. Name / Position of Key Staff

Archt Muhammad Naeem Mir /
Ziaud Din Mian Structural Engineer

 

14. Description of Project

The Building comprises upon chairman office admin officer 4 class rooms and forging lab

 

15. Description of Services

Architectural Structural Design and top Supervision

 

09

1. Name of the Assignment

Hostel for 180 Girl Students, UET Lahore

2. Country

Pakistan

3. Name of Client

Project Director UET Lahore

4. Address

UET Lahore

5. Start Date

Feb 2005

6. Completion Date

July 2005

7. Professional staff provided

Architect structural engineer and Building Engineer

8. No. of Staff

10

9. No. of Staff Months

5 months

10. Approx: Value of Services

0.87 M

11. Name of Other JV Firms

None

12. No. Of Staff / Staff Monts

None

13. Name / Position of Key Staff

Archt Muhammad Naeem Mir /
Ziaud Din Mian Structural Engineer

 

14. Description of Project

The building houses 180 girls students in 30 dormitories in two floors with attached bath rooms including dining hall T.V lounge and common room

 

15. Description of Services

Architectural Structural Design and top Supervision

10

1. Name of the Assignment

Seminar Hall

2. Country

Pakistan

3. Name of Client

P.D UET Lahore

4. Address

Lahore

5. Start Date

June 2006

6. Completion Date

October 2006

7. Professional staff provided

Architect structural engineer and Building Engineer

8. No. of Staff

6

9. No. of Staff Months

4 months

10. Approx: Value of Services

0.117 M

11. Name of Other JV Firms

None

12. No. Of Staff / Staff Monts

None

13. Name / Position of Key Staff

Archt Muhammad Naeem Mir /
Ziaud Din Mian Structural Engineer

14. Description of Project

This assignment was the “adoptive reuse” of redundant structure. A Chemical Engineering Lab shed measuring 54’X121’ was remodeled into seminar hall having seating capacity 210, with stage and back stage facilities. Interior design objectives were to achieve good acoustic environment supported be multimedia projection and HVAC Systems. Exterior finishes including brick tiles and cement plaster, having weather shield paint. Description of actual services provided by your staff within the assignment:
Interior and exterior finishing, lighting and illumination, HVAC and Public address system, furniture layout.

11

1. Name of the Assignment

Department of Architectural Engineering and Design UET Lahore

2. Country

Pakistan

3. Name of Client

Project Director UET Lahore

4. Address

UET Lahore

5. Start Date

June 2004

6. Completion Date

October 2004

7. Professional staff provided

Architect structural engineer and Building Engineer

8. No. of Staff

6

9. No. of Staff Months

4 months

10. Approx: Value of Services

0.67 M

11. Name of Other JV Firms

None

12. No. Of Staff / Staff Monts

None

13. Name / Position of Key Staff

Archt Muhammad Naeem Mir /
Ziaud Din Mian Structural Engineer

14. Description of Project

Department of Architectural Engineering and Design for 300 Students and 15 faculty members including testing of Material lab computer lab soil investigation lab and 4 lecture theaters.

15. Description of Services

Architectural Structural Design and top Supervision

12

1. Name of the Assignment

Master Plan of Mayo Hospital Lahore

2. Country

Pakistan

3. Name of Client

Department of Health Govt of Punjab

4. Address

Lahore

5. Start Date

1986

6. Completion Date

1989

7. Professional staff provided

Architect structural engineer and Building Engineer

8. No. of Staff

8

9. No. of Staff Months

36 months

10. Approx: Value of Services

1.5 M

11. Name of Other JV Firms

None

12. No. Of Staff / Staff Monts

None

13. Name / Position of Key Staff

Dr. Mahmood Hussain, Perviz Vandal
Archt Muhammad Naeem Mir /
Ziaud Din Mian Structural Engineer

14. Description of Project

The project comprised of the following buildings Land use pattern, Services
(water supply, sewerage, telephone and
gas, road net work), Age and condition
of buildings, Parking facilities
2) Identification of special problems.
3) Proposal- short -term and long term solution
4) Physical plan proposal
Building programConservation and restoration of main block Services network Space requirement-20 year’s projection

13

1. Name of the Assignment

Punjab Medical College and Hospital Complex, Failalabad

2. Country

Pakistan

3. Name of Client

Department of Health Govt of Punjab

4. Address

Lahore

5. Start Date

1976

6. Completion Date

1980

7. Professional staff provided

Architect structural engineer and Building Engineer

8. No. of Staff

18

9. No. of Staff Months

48 months

10. Approx: Value of Services

6.2 M

11. Name of Other JV Firms

None

12. No. Of Staff / Staff Monts

None

13. Name / Position of Key Staff

Dr. Mahmood Hussain, Perviz Vandal
Archt Muhammad Naeem Mir /
Ziaud Din Mian Structural Engineer

14. Description of Project

Master planning, Landscape design, Architectural and engineering design and
Top supervision, Medical College for 1250 students, 1000 Bed Hospital
The area requirements were grouped on the basis of their functioning in the following categories:-
College Building, Administration building academic building Auditorium Library
Hospital building 1,000 beds accommodation in two nursing block (500 beds each)
Hostel buildings (Students and Nurses) Four hostels for boys to accommodate 900 male students,One hostel for girls to accommodate 150 female students.Residential accommodation for college and hospital staff residences for grade 20. 64 residences for grade 18-19. 100 residences for grade 16-17 Residences for house surgeon /internees to accommodate 100 persons Mosque with residence, Garages for ambulances and other hospital vehicles
Sports activities Squash courts swimming pool and cricket ground with open seating and one covered pavilion to accommodate 1000 spectatorsLand development Roads, pavements, street lights, boundary wall and landscaping of all open spaces.

14

1. Name of the Assignment

Master Plan King Edward Medical College Lahore

2. Country

Pakistan

3. Name of Client

Department of Health Govt of Punjab

4. Address

Lahore

5. Start Date

1984

6. Completion Date

1986

7. Professional staff provided

Architect structural engineer and Building Engineer

8. No. of Staff

10

9. No. of Staff Months

24 months

10. Approx: Value of Services

0.5 M

11. Name of Other JV Firms

None

12. No. Of Staff / Staff Monts

None

13. Name / Position of Key Staff

Dr. Mahmood Hussain ,
Archt Muhammad Naeem Mir /
Ziaud Din Mian Structural Engineer

14. Description of Project

The project comprised of the following buildings survey and assessment of building fabric of following building Administration,
Anatomy,Bio-chemistry, Pathology,
Pharmacology & Pharmacy,
Hygiene & Preventive Medicine
Departments, Sports Complex & Stadium and Master Planning